Skip to Main Content

2015/2017 Code Development: Group B

News

ICC Board Verifies 2016 Group B Final Action OGCV Process. In accordance with Section 10.0 of CP28 Code Development, the ICC Board of Directors has verified a valid 2016 Online Governmental Consensus Vote (OGCV) process as certified by the Validation Committee. The Final Action on all 2016 Group B code change proposals, including the vote tallies from the OGCV, are available here. All totaled, there were 577 code change proposals considered during the OGCV.

Preliminary Online Governmental Consensus Voting Results Available. The preliminary OGCV results are available by clicking here. The results are preliminary as the audited process requires certification by the Validation Committee and ultimately confirmation by the ICC Board of Directors.

Public Comment Hearing Agenda Available.  The results from the 2016 Public Comment Hearing (PCH) for Group B code development is now available.

The Code Change Agenda, Report of the Committee Action Hearing, and the Public Comment Agenda for the 2016 Group B Code Change cycle will be posted below.

Note that the on-line versions are PDF files that contain three new features:

  • Highlighting and commenting (using Adobe Reader)
  • Adobe search
  • Bookmarks

The files are also designed for quicker downloads.

For the 2015/2016/2017 Schedule, click here.


Group B - Public Comment Agenda

PDF Complete Monograph Published 09/09/16 81 MB
PDF Discussion Guide and Technical Updates to the Public Comment Agenda Published 10/10/16 716 KB
PDF Additional Updates to the Discussion Guide Published 10/14/16 1 KB
PDF Introduction Published 09/09/16 499 KB
PDF IADMIN Published 09/09/16 2063 KB
PDF IBC - Fire Safety Published 09/09/16 751 KB
PDF IBC - General Published 09/09/16 1266 KB
PDF IBC - Structural Published 09/09/16 15177 KB
PDF IEBC Published 09/09/16 1165 KB
PDF IECC - Commercial Published 09/09/16 7667 KB
PDF IECC - Residential & IRC - Energy Published 09/09/16 10898 KB
PDF IFC Published 09/09/16 11899 KB
PDF IPMC Published 09/09/16 698 KB
PDF IRC - Building Published 09/09/16 35 MB
PDF IUWIC Published 09/09/16 1115 KB

Group B – Report of the Committee Action Hearing


Group B - Proposed Changes to the 2015 Editions

Click icon to view document(s).

Code change posting font size: ICC has corrected the font size for the IBC-Structural, IECC-Commercial, IFC and IRC-Building code changes.  The respective PDF files for these have been replaced in the Complete Monograph and the individual monographs and can now be printed in readable format.

PDF Complete Monograph Published 03/17/16 102 MB
PDF Group B Consolidated Monograph Updates Published 03/26/16 3108 KB
PDF Updates to the Consolidated Monograph Updates Published 04/06/16 7685 KB
PDF Updates to the 2015 Proposed Changes for the International Codes Published 04/14/16 609 KB
PDF Updates to the Committee Rosters Published 04/14/16 6 KB
PDF Introduction Published 03/08/16 722 KB
PDF CCC Published 03/08/16 786 KB
PDF IADMIN Published 03/08/16 2266 KB
PDF IBC - Fire Safety Published 03/08/16 868 KB
PDF IBC - General Published 03/08/16 1069 KB
PDF IBC - Means of Egress Published 03/08/16 776 KB
PDF IBC - Structural Published 03/17/16 23748 KB
PDF IEBC Published 03/08/16 1703 KB
PDF IECC - Commercial Published 03/17/16 17930 KB
PDF IECC - Residential & IRC - Energy Published 03/08/16 10543 KB
PDF IFC Published 03/17/16 12975 KB
PDF IMC Published 03/08/16 732 KB
PDF IPMC Published 03/08/16 983 KB
PDF IRC - Building Published 03/17/16 45208 KB
PDF IUWIC Published 03/08/16 1115 KB
PDF Proposed New Standard Analyses Published 03/31/16 168 KB